Installation 11 – Breckwell P22FSL User Manual
Page 11
B.
WHEN VENT PIPE EXTENDS TO CHIMNEY TOP
(Refer to Figures 16 and 17)
1.
You will need a pipe length equal to the chimney
height (from hearth) plus 6 inches. If outside
combustion air is to be used, you will need a pipe
length (see “COMBUSTION AIR SUPPLY”) equal to
the chimney height plus 12 inches.
2.
Attach cerablanket wrap (not included) to that end of
vent pipe that will connect to the stove. Use 12-inch
lengths of light gauge metal wire (not included) or
metallic tape (not included). This is to protect interior
components from excess heat.
3.
Set the insert on the hearth and slide it in far enough
to attach the vent pipe (and combustion pipe if
used).
4.
Attach flashing (refer to Figure 15), route power cord
out the side nearest a 120V receptacle. Slide in
insert.
5.
Measure and build chimney top. Cut out hole for
vent pipe (and combustion air intake pipe, if used).
Install and seal with a non-hardening mastic to
prevent water leakage. Install the vent cap.
C.
WHEN VENT PIPE EXTENDS THROUGH
CHIMNEY BLANKING PLATE
(Masonry Fireplaces Only)
(Refer to Figures 16 and 17)
1.
You will need a pipe length that extends 12”
above the blanking plate. NOTE: This
installation is optional but not recommended.
Outside combustion air cannot be drawn from
the chimney cavity in this installation.
2.
Attach cerablanket wrap (not included) to that
end of vent pipe that will connect to the stove.
Use 12-inch lengths of light gauge metal wire
(not included) or metallic tape. This is to protect
interior components from excess heat.
3.
Measure and build blanking plate. Cut out hole
for vent pipe (and combustion air intake pipe, if
used). Install and carefully seal blanking plate
with non-hardening mastic. Failure to properly
seal may result in smoke spillage.
4.
Slide vent pipe (and intake pipe if used) up
through the blanking plate hole, leaving enough
to pull back down.
5.
Set the insert on the hearth, adjust the leveling
bolts on the rear sides, slide it in far enough to
attach the vent pipe (and combustion air pipe if
used). Be sure to seal where the pipe passes
through the blanking plate.
6.
Attach flashing (refer to Figure 15), route power
cord out the side nearest a 120V receptacle.
Slide in insert.
INSTALLATION
11
FIGURE 16
FIGURE 17