Spezial_gb_montage 25.pdf, Quick and easy assembly, Assembly without auxiliary crane – Liebherr LRB 125 XL User Manual
Page 25: Change of equipment with quick connection

25
S20-32_Spezial.indd 25
S20-32_Spezial.indd 25
14.03.2007 9:18:20 Uhr
14.03.2007 9:18:20 Uhr
Quick and easy
assembly
Thanks to their compact design Liebherr piling and drilling rigs can mostly be trans-
ported in one piece, assembly work on the jobsite can be minimized and the machines
are ready for operation within a very short period of time.
Assembly without auxiliary crane
If the counterweight of a larger machine is transported separately it can be assembled
on site using the leader of the LRB machine without the need for an auxiliary crane. This
means signifi cant cost savings.
Change of equipment with quick connection
Various working tools can be mounted on the universal slide via quick connection
device and the LRB machines are ready for another production method in a very short
period of time.
Hitch the joint plate
Lower and
secure with pin
Hydraulic
quick connection
Spezial_GB_TEXT.indd 25
Spezial_GB_TEXT.indd 25
21.03.2007 8:44:59 Uhr
21.03.2007 8:44:59 Uhr