beautypg.com

Operation – Bacharach 24-7224 User Manual

Page 4

background image

Flue Gas Sample Conditioning System

4

Bacharach, Inc.

Instruction 4-9415

Operation

When ready to conduct a combustion efficiency test, plug in the power

supply of the Flue-Gas Sample Conditioning System. You should hear

the condensate pump start running and see the Peltier cooler’s red LED

turn on and off as the cooler is cycled. Note that the cooler’s operating

time changes according to its temperature.
Set up and configure the combustion analyzer as described in its in-

struction manual. Then insert the probe into the flue stack and begin

testing.
During the combustion test, the condensed water vapor from the flue

gas will accumulate inside the pump’s reservoir. If the water level be-

gins to approach the ends of the tubes inside the reservoir, then stop the

test and empty the reservoir as described in the Maintenance Section of

this manual.

WARNING!

The probe tube is hot! In the following step, be

sure to allow the probe tube sufficient time to cool before

handling.

At the conclusion of the combustion test, remove the probe from the

stack; then unplug the Peltier cooler’s power supply.

This manual is related to the following products: