beautypg.com

Technical data, Equipment setup – Bacharach 24-7224 User Manual

Page 2

background image

Flue Gas Sample Conditioning System

Bacharach, Inc.

Instruction 4-9415

Technical Data

Probe:

Standard Length ......................................................... 11.5 in (295 mm)

Optional Lengths ............................................................. 7 in (180 mm)

19.5 in (500 mm)

39 in (1000 mm)

Peltier Cooler:

Inlet Sample Dew Point.......................................... 149 °F (65 °C) max.

Outlet Sample Dew Point .................18 °F (10 °C) min. below ambient

Cooling Power ................................................................................. 10 W

Environment Temperature .............................32 to 104 °F (0 to 40 °C)

Weight ................................................................................8.5 oz (240 g)

Condensate Pump:

Sample Flow Rate ..........................................................1.5 LPM @ STP

Length of Hose ...................................................................... 6.6 ft (2 m)

Reservoir Storage ........................................................................... 50 ml

Environment Temperature .............................32 to 104 °F (0 to 40 °C)

Weight ..............................................................................12.7 oz (360 g)

Power Supply:

Input ..............................................................100 to 240 VAC, 50/60 Hz

Output ............................................................ 9 VDC, max. @ 4 A, max.

Equipment Setup

Refer to Figure 2. If not already done, attach the Peltier cooler to the

probe assembly by first removing the plastic end cap from the rear of

the probe, and then inserting the cooler’s inlet connector, ensuring first

that a filter is present between the cooler and probe.
Attach the pump’s inlet hose to the bottom of the Peltier cooler. Water

that is condensed from the flue-gas sample will be pumped into the con-

densate pump’s reservoir through this hose. Note that the condensate

pump can be placed in an upright, horizontal, or hanging position. A

magnet mounted in the base of the pump allows the pump to be at-

tached to overhead ductwork.
Connect the power supply’s DC output connector to the condensate

pump; then connect the condensate pump’s DC output power connector

to the Peltier cooler. The Peltier cooler and its associated condensate

pump are started by plugging the power supply into a source of AC

power that is between 100 and 240 VAC, 50/60 Hz.
Connect the probe assembly’s stack-temperature thermocouple con-

nector, pressure fitting, and flue-gas fitting to the combustion analyzer

per the analyzer’s instruction manual.

This manual is related to the following products: