beautypg.com

Dealer preparation check list – Bush Hog BH750 User Manual

Page 5

background image

DEALER PREPARATION CHECK LIST

BH650 - BH750 - BH850 - BH950 BACKHOES

BEFORE DELIVERING MACHINE - The following check list should be completed.

Use the Operator’s Manual as a guide.

q

Machine properly assembled.

q

All safety decals readable (See decal page).

q

All bolts tightened to torque specifications given in the torque chart.

q

Machine operates properly.

q

Operator’s manual has been delivered to owner and he has been instructed
on the safe and proper use of the backhoe.

Dealer’s Signature

CAUTION:

It is recommended that the tractor be equipped with Rollover

Protection System (ROPS) and seat belt be used for all

implement operations.

.

It is the responsibility of the dealer to complete the procedures listed

above before delivery of this implement to the customer.

THIS CHECKLIST TO REMAIN IN OWNER’S MANUAL

3