Installation – Alloy Computer Products 16-PORT GIGABIT WEB SMART SWITCH GSS-16T2SFP User Manual
Page 14

8
2. Installation
2-1. Starting the GSS16T2SFP Gigabit Web Smart Switch
This section provides a quick start guide for:
-
Hardware and Cable Installation
- Management Station Installation
- Software booting and configuration
2-1-1. Hardware and Cable Installation
Please Note:
⇒ Wear a grounding strap device to avoid damaging the switch with electrostatic
discharge.
⇒ Be sure that the power switch is in the ‘OFF’ position, before you insert the power
cord.
• Installing any optional SFP Fiber Transceivers to the GSS16T2SFP Gigabit
Web Smart Switch.
• Connecting the SFP Module to the Chassis:
The optional SFP modules are hot swappable, so you can plug or unplug them
while the power is applied to the switch.
1. Verify that the SFP module is of the correct type to suit the switch
2. Slide the module along the slot and ensure that the module is properly
seated against the slot socket/connector.
3. Install the media cable for network connection
4. Repeat the above steps, as needed, for each module to be installed into
the switch
Fig. 2-1 Installation of Optional SFP Fiber Transceiver