1 tractor pre-operation inspection/service, 2 sickle bar pre-operation inspection/service, Operation – Alamo Switchblade Sickle Bar 5 User Manual
Page 83: Opera t ion
OPERATION
SB5/6 03/09
Operation Section 3-9
© 2009 Alamo Group Inc.
OPERA
T
ION
5.1 Tractor Pre-Operation Inspection/Service
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to the
manufacturers recommendations. The following
are some of the items that require daily service and
inspection:
•
Tire condition/air pressure
•
Wheel lug bolts
•
Steering linkage
•
PTO shield
•
SMV sign is clean and visible
•
Tractor’s lights are clean and functional
•
Tractor Seat belt is in good condition
•
Tractor ROPS is in good condition
•
ROPS is in the raised position
•
No tractor oil leaks
•
Radiator free of debris
•
Engine oil level and condition
•
Engine coolant level and condition
•
Power brake fluid level
•
Power steering fluid level
•
Fuel condition and level
•
Sufficient lubrication at all lube points
•
Air filter condition OPS-U-0030
5.2 Sickle Bar Pre-Operation Inspection/Service
Before each Sickle Bar use, a complete inspection and service is required to ensure the Sickle Bar is in a
good and safe working condition. Damaged and/or broken parts should be repaired and/or replaced
immediately. To ensure the Sickle Bar is ready for operation, conduct the following. OPS-SB-0001
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)