beautypg.com

Hh-3, Parts list, Screw torque in foot pounds – Sheffer HH SERIES User Manual

Page 4: Tie rod torque for 1, Through 6" bores, Tie rod torque for 7" bore and larger

background image

ITEM QTY.

NUMBER

DESCRIPTION

REQ'D

100

FRONT FLANGE

1

102

FRONT FLANGE EXTRA

1

103

REAR FLANGE

1

104

REAR FLANGE EXTRA

1

105

*

FOOT BRACKET – FRONT

1

106

*

FOOT BRACKET – SCREW

2

107

*

FOOT BRACKET – REAR

1

112

CLEVIS PIN

1

117

INTERMEDIATE TRUNNION

1

108

*

END LUG – FRONT

2

110

*

END LUG – REAR

2

*Not available on 10", and larger bore cylinders.

FRONT FLANGE
MOUNT
STYLE FF

REAR FLANGE MOUNT
EXTRA SIZE
STYLE RFX

FRONT FLANGE MOUNT
EXTRA SIZE
STYLE FFX

FOOT BRACKET MOUNT
STYLE FB

INTERMEDIATE TRUNNION MOUNT
STYLE T

REAR FLANGE MOUNT
STYLE RF

CLEVIS MOUNT
STYLE C

END LUG MOUNT
STYLE
EL

100

107

102

112

103

104

110

108

106

105

117

Parts List

L

Scribe on Line Head

1

2

3

4

5

6

7

8

9

10

11

Screw Torque in Foot Pounds

BORE

PISTON ROD

HEX HEAD

SOCKET HEAD

SIZE

DIAMETER

CAP SCREW

CAP SCREW

1

1

/

8

5

/

8

8

1

1

/

2

ALL

13.6

2

ALL

5

2

1

/

2

1, 1

3

/

8

5

2

1

/

2

1

3/4

33

3

1

/

4

ALL

5

4

ALL

5

5

2, 2

1

/

2

5

5

3, 3

1

/

2

10

6

2

1

/

2

5

6

3, 3

1

/

2

, 4

10

7

ALL

10

8

ALL

10

10

4

1

/

2

, 5, 5

1

/

2

10

10

7

40

12

5

1

/

2

10

12

7

40

12

8

70

14

7

40

14

10

95

COLUMN

1 FULL

2 FULL

3 FULL

1

TURN

TURNS

TURNS

TURN (T)

L

PLUS T

PLUS T

PLUS T

IN 12THS

LENGTH

L LENGTH

L LENGTH

L LENGTH

1

2

3

/

4

36

1

/

2

70

103

5

/

8

2

5

5

/

8

39

1

/

4

72

3

/

4

106

1

/

2

3

8

1

/

2

42

75

5

/

8

109

1

/

4

4

11

1

/

4

44

3

/

4

78

1

/

2

112

5

14

47

5

/

8

81

1

/

4

114

3

/

4

6

16

3

/

4

50

1

/

2

84

117

5

/

8

7

19

5

/

8

53

1

/

4

86

3

/

4

120

1

/

2

8

22

1

/

2

56

89

5

/

8

123

1

/

4

9

25

1

/

4

58

3

/

4

92

1

/

2

126

10

28

61

5

/

8

95

1

/

4

128

3

/

4

11

30

3

/

4

64

1

/

2

98

131

5

/

8

12

33

5

/

8

67

1

/

4

100

3

/

4

134

1

/

2

For 7" bore cylinders and larger, the tie
rods are given an initial torque, the tie
rods are heated, and then the tie rod
nuts are turned a calculated amount.
First torque all 4 tie rod nuts to 200-250
foot pounds. Measure the cylinder to
obtain length L, consult the chart for the
proper number of turns or fractions (in
12ths). The figures in Column 1 shown
in 12ths corresponds to the points and
flats of the hex nut (see illustration).
The piston rod of the cylinder should be
either fully retracted or fully extended
prior to heating. Place an asbestos sheet
between the tube and tie rod and heat to
800°F for as long a length as possible.
When the distance between the cylinder
heads is 18" or less, do not heat closer
than 3" of either head. Tie rods should
be heated and tightened in cross corner
rotation and in steps up to full tension.
Allow the tie rods to cool before testing
or installation.

Parts List

Tie Rod Torque for
1

1

/

8

" through 6" Bores

TORQUE IN

TORQUE IN

BORE

FOOT POUNDS

BORE

FOOT POUNDS

1

1

/

8

8

3

1

/

4

110

1

1

/

2

30

4

130

2

50

5

325

2

1

/

2

50

6

480

Tie Rod Torque for
7" Bore and Larger

1

HH-3