Chemglass 30L thru 50L Jacketed User Manual
Page 2
www.cglifesciences.com
Read Entire Assembly Instructions Before You Begin. Familiarize Yourself with All of the Parts,
and Pay Close Attention to All Notes and Highlights.
Support frames are shipped via common carrier and require loading dock access with a fork lift or jack. If you
do not have a loading dock, then a lift gate-equipped truck must be requested at the time of order.
For your convenience, the jacketed process reactor, the fully assembled reactor head, stirrer shaft & agitators,
Tru-Stir™ stirrer shaft coupling, flake catching cup, PTFE stirrer bearing, temperature probe & adapter, S.S.
inlet/outlet adapters and motor are shipped assembled on the support frame. PTFE sleeves and keck clips are
available separately.
Unpack all of the parts and check against the packing slip to make sure you have received all necessary
components. If possible, keep some of the packaging materials from the wood crates in case you need to return
items for repair or replacement.
Crate # 1:
Unpack the support frame with reactor and components by removing the packing material from around
the reactor. Contains the 1/4 HP electric stirrer motor, condenser, zero dead space drain valve,
temperature monitor, monitor controller, and other miscellaneous parts. Re-tighten all of the Allen
screws with the supplied wrenches. CHECK ALL ALLEN SCREWS BEFORE PROCEEDING;
SCREWS CAN LOOSEN DURING SHIPMENT.
Move the reactor assembly and parts near the hood or area where the reactor will be used, but allow enough
space to move freely around the support frame. During setup, preparation, and process, it is best to keep the
wheels in their locked position by stepping down on the tab.
Motor
Mount Arm
CG-2046 Stirrer
Shaft Coupling
Universal Motor Mount Arm
The universal motor mount
arm can unlock and swing out
giving greater access to the
reactor and peripheral
glassware.