Installation procedure – Muxlab VGA 4x1 Switcher User Manual
Page 11
© MuxLab Inc.
VGA 4x1 Switcher Installation Guide
Page 11
3.4. Installation
Procedure
In order to install the VGA 4x1 Switcher, please follow
the steps below:
1. Install the VGA 4x1 Switcher in its final location.
2. Connect an Active VGA Balun II Transmitter to
each VGA source. If there are any local monitors,
connect them to the Local Monitor Output of the
associated Active VGA Balun II Transmitter via a
VGA cable (not included).
3. If the distance exceeds the MuxLab specification for
remote power, connect a Power Supply (500144) to
the Active VGA Balun II Transmitter. The green
power LED should be ON.
4. Connect a length of Cat 5e/6 (or better) UTP cable
between the each Active VGA Balun II Transmitter
and the VGA 4x1 Switcher.
5. Connect an Active VGA Balun II Receiver to the
display.
6. If the distance exceeds the MuxLab specification for
remote power, connect a Power Supply (included
with the Active VGA Balun II Kit) to the Active
VGA Balun II Receiver. The green power LED
should be ON.