Nspection – Glastender BLC-3/4-2 User Manual
Page 4
3
Glastender, Inc. • 5400 North Michigan Road • Saginaw, MI • 48604-9780
800.748.0423 • 989.752.4275 • Fax 989.752.4444 • www.glastender.com
1. i
nspeCtion
u
pon
a
RRivaL
:
Immediately upon arrival, a visual inspection of the carton should be made to determine if there is evidence of damage
in shipment. Following uncrating, make an inspection for any signs of external damage.
2. s
et
-u
p
of
R
emote
G
LyCoL
L
ine
C
hiLLeR
:
Once the survey of the location has been completed to determine the positioning of the remote glycol line chiller and the
connecting draft beer dispensing stations (refer to the specification sheet to be certain that the trunk line will be within
the recommended distance), make the necessary provisions to locate the unit and provide for the electrical services.
The ideal set-up is to mount the glycol line chiller on a proper machine stand that is easily accessible for routine main-
tenance and service.
In less-than-ideal circumstances, it may be necessary to locate the unit on top of the walk-in cooler or on the floor.
NOTE: Do not locate the glycol chiller in the walk-in cooler, as the cold ambient temperature will reduce the
cooling performance of the unit.
NOTE: A minimum of six inches of clearance should be allowed around the entire unit for proper performance.
Additional clearance should be considered for above the unit and in front of the unit for serviceability.
NOTE: When installed above walk-in cooler, ensure air flow is sufficient to maintain 80°F or lower ambient
temperature to maintain rated cooling capacity.
If the unit is located on the floor:
• Ensure the cabinet is sealed to the floor with NSF listed silicon RTV sealant applied around the entire bottom edge
of the cabinet.
• An optional 4" leg set is available as an accessory.
3. e
LeCtRiCaL
h
ook
-u
p
:
Models BLC-1/3, BLC-1/3-E, BLC-1/2, BLC-3/4, & BLC-3/4-2 are supplied with a 20 Amp grounded cord and plug
that connects at the rear of the unit. Models BLC-1/3-2 & BLC-1/2-2 ship as hard wire units and are supplied with a 30
Amp grounded cord only (no plug) that connects at the rear of the unit. A corresponding 20 Amp or 30 Amp grounded
receptacle or junction box, depending on the line chiller model used, must be installed within reach of the unit.
4. G
LyCoL
L
ine
C
onneCtion
:
Typically, glycol recirculating lines are used to transport the glycol in the line chiller to and from the walk-in cooler to be
connected to the glycol lines in the beer line set.
i
nspeCtion
anD
s
et
-u
p
Recirculating Return
Connect your glycol recirculating
line from the beer line set to the
Line Chiller 3/8" barb fitting.
Recirculating Outlet
Connect your glycol recirculating
line from the beer line set to the
Line Chiller 3/8" barb fitting.