Preparation of the machine – NaceCare Solutions ST60BT User Manual
Page 6
![background image](/manuals/460577/6/background.png)
6
PREPARATION OF THE MACHINE
UNPACKING THE MACHINE
Figure 2
The machine is delivered packed on a pallet. To move it use a fork truck or a pulley
block with sling.
Figure 3
To remove the package proceed as follows:
1. Remove the fixing tapes
2. Remove the metal staples at package base.
3. Take off the carton.
Package size : 135x93x130.
Weight of packed machine without batteries: 170 kg
SLIDING THE MACHINE DOWN OFF THE PALLET
Figure 4
1. Use a hammer to remove the front crosspiece of the pallet to create a ramp.
See also other documents in the category NaceCare Solutions Water equipment:
- AV12QX (7 pages)
- TP12QX (6 pages)
- TP12QX (8 pages)
- TP4X (5 pages)
- AV18AX (7 pages)
- TP18DX (4 pages)
- AV18SX (7 pages)
- AV4X (4 pages)
- AVB4X (7 pages)
- AVB9X (8 pages)
- DM1400 (26 pages)
- DP340 (23 pages)
- E700 (9 pages)
- HZD750 (3 pages)
- JS1500 (3 pages)
- JV2000 (5 pages)
- K1120T (39 pages)
- K1122TST (48 pages)
- NA1520 (4 pages)
- NR1520 (11 pages)
- NR17 (12 pages)
- NS17 (16 pages)
- NSP200 (2 pages)
- NSR200 (9 pages)
- NTT2000 (4 pages)
- PVR390 (16 pages)
- RM1800F (9 pages)
- RM1800H (8 pages)
- RSV100 (3 pages)
- SM1200 (18 pages)
- SNTD750 (4 pages)
- ST360 (24 pages)
- ST40BT (6 pages)
- ST50BT (16 pages)
- ST575 (14 pages)
- ST726 (22 pages)
- ST755 (17 pages)
- ST875 (16 pages)
- ST965 (25 pages)
- TP18SXHP (6 pages)
- TP400F (8 pages)
- TT350 (24 pages)
- TT3450 (26 pages)
- TTB1840 (24 pages)