2 hauling the tractor and implement, Hauling the tractor and implement -37, Operation – Alamo Exten-A-Kut II User Manual
Page 129: Opera t ion
OPERATION
EK II 03/09
Operation Section 3-37
©2009 Alamo Group Inc.
OPERA
T
ION
Make certain that the “Slow Moving Vehicle” (SMV) sign is installed in
such a way as to be clearly visible and legible. When transporting the
Equipment use the Tractor flashing warning lights and follow all local
traffic regulations.
(SG-6)
Reduce speed before turning or applying the brakes.
Ensure that both brake pedals are locked together
when operating on public roads. OPS-U- 0023
12.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through. OPS-U- 0024
- 02986941P (99 pages)
- Machete T 7740 (90 pages)
- Switchblade Sickle Bar 6 (112 pages)
- FALCON 15/10 (156 pages)
- AXTREME2 02988075P (174 pages)
- Brahma 02968822P (64 pages)
- JD-5205 (104 pages)
- RX72 (52 pages)
- MACHETE 02968915C (174 pages)
- none (150 pages)
- 00756179P (70 pages)
- Lawn Mower (70 pages)
- Maverick Boom Arm Mower (174 pages)
- 803213C (140 pages)
- A-Boom (226 pages)
- 02979718C (110 pages)
- 272 (136 pages)
- A84B (148 pages)
- RHINO 2409 (106 pages)
- SHD96 (140 pages)
- 7191852C (110 pages)
- SAMURAI 02986950P (104 pages)
- 800 (58 pages)
- FC-0002 (122 pages)
- A60 (138 pages)
- ST10 (74 pages)
- RHINO 7214 MSL (44 pages)
- RHINO 95C (56 pages)
- A72B (138 pages)
- 803350C (168 pages)
- Interstater 803213C (186 pages)
- 6212 (100 pages)
- 4211 MSL (104 pages)
- Eagle 14 (186 pages)
- RHINO FX21 (156 pages)
- TS-135A (72 pages)
- TS-100A (154 pages)
- 02968915P (170 pages)
- Axtreme 02983326P (116 pages)
- RX96 (172 pages)
- 00761808C (170 pages)
- Axtreme 02984405 (106 pages)
- Swingtrim (126 pages)
- Axtreme FC-P-0002 (114 pages)