2. WIRING BACK TO THE PLC (Programmable Logic Controller), 0, 8

a)

PROBABLE CAUSES;

1. CLOGGED LINT SCREEN OR LINT BAG

2. AIR PRESSURE SETTING

3. AIR PRESSURE SWITCH - PS3 OR WIRING BACK TO THE PLC (Programmable Logic

Controller)

b)

POSSIBLE SOLUTIONS;

1. Perform preventive maintenance and screen cleaning procedures.

2. Set correct pressure settings.

3. For a quick check of the AIR PRESSURE SWITCH WIRING, perform the following:

-

Run a drying cycle

-

Does the pressure switch’s indicator come “ON”?

- If “YES,” switch and its adjustment

- If “NO,” check switch and its adjustment

-

Verify that PLC (Programmable Logic Controller) input L.E.D. #5 comes “ON”

-

Does L.E.D. #5 come “ON” when the switch is active?

- If “YES,” wiring is OK

- If “NO,” check:

- Switch, its setting and wiring

- Check wiring back to the base electrical junction box

- Check PLC (Programmable Logic Controller)

- Refer to blueprints: Main Electrical Panel Diagram, Base Junction Box Wiring Diagram

-

Re-test; verify that the signal is operational