LBL Lighting MO Direct Feed Standoff for Canopy User Manual
Rigid standoff, Install the rigid standoffs, Installation instructions for

Installation Instructions for
Rigid Standoff
980MRLSPPFC
1
Install the Rigid Standoffs
ANCHOR
G
P
I
:
ENERAL
RODUCT NFORMATION
This product is suitable for indoor dry locations only.
This product is intended to be used with LBL direct power feed
canopies and Monorail system only.
Select a location on the ceiling where the Monorail is to be
mounted.
One way of marking the standoff locations on the ceiling is to
lay the Monorail on the floor underneath of the selected
location and by using a plumb bob pointing on the center of
the Monorail, mark the points on the ceiling.
The other way is to hold the Monorail directly against the
ceiling and mark the standoff points on the ceiling.
Tap the anchors at the marked points up to the threaded
portion with a hammer.
Screw the anchors in the rest of the way with a Phillips
screwdriver.
Insert the #8 screw into the threaded nipple and washer.
Tighten the #8 screw completely into the anchor to secure the
washer and threaded nipple.
Repeat step 4 through 6 for the remaining standoffs.
ANCHOR
WASHER
#8 SCREW
THREADED NIPPLE
CAUTION:
This standoff is not applicable with
vaulted ceilings.
CEILING
Monorail
1.2
HANGERDIR_
1A
CAUTION - RISK OF FIRE
This product requires installation by a qualified
electrician. Before installing be sure to read all
instructions and TURN THE POWER TO THE
ELECTRICAL BOX OFF.
1B
1C
1
2
3
4
5
6
7
4
6