LBL Lighting MO Telescoping Rigid Standoff User Manual
Telescoping rigid standoffs, Install the ceiling anchor
Installation Instructions for
Telescoping Rigid Standoffs
1.3
HANGER-ADJ-_(-BJ)
980MRLTSP
1
Install the Ceiling Anchor
ANCHOR
G
P
I
:
ENERAL
RODUCT NFORMATION
This product is suitable for dry locations only.
This product must be used with LBL Monorail systems only.
This instruction is for the following models:
Monorail Support 2.6" - 4" (HANGER-ADJ-_1)
Monorail Support 6" - 10" (HANGER-ADJ-_2)
Monorail Support 12" - 24" (HANGER-ADJ-_3)
Monorail Support 24" - 48" (HANGER-ADJ-_4)
Monorail Support 48" - 96" (HANGER-ADJ-_5)
Above model numbers with -BJ suffix (vaulted ceilings).
Select a location on the ceiling where the Monorail is to be
mounted.
One way of marking the standoff locations on the ceiling is to
lay the Monorail on the floor underneath of the selected
location and by using a plumb bob pointing on the center of
the Monorail, mark the points on the ceiling.
Another way is to hold the Monorail directly against the ceiling
and mark the standoff points on the ceiling.
Tap the anchors at the marked points up to the threaded
portion with a hammer.
Screw the anchors in the rest of the way with a Phillips
screwdriver.
Insert the #8 screw into the threaded nipple and washer.
Tighten the #8 screw completely into the anchor to secure the
washer and threaded nipple.
Repeat these steps for each standoff.