LBL Lighting Electrical Box User Manual
2” electrical box, For new construction installation, Installation instructions for
Installation Instructions for
1
ACCESSORIES
For New Construction Installation
Select the location for the 2" electrical box.
Place the adjustable bar between the studs.
ADJUSTABLE BAR
Line up the front edge of the side brackets with front
edge of the studs.
Hammer the tabs on side brackets into the studs to hold
the adjustable bar.
Secure the adjustable bar into the studs with four #8
screws.
STUD
SIDE BRACKET
TAB
#8 SCREW
#8 SCREW
If mounting the conduit onto back of the 2" electrical
box, remove the two #4 screws from the back cover to
detach the back cover from the box.
Remove the knock out and mount the conduit.
Replace the back cover and #4 screws if removed.
Conduit can also be mounted on the side knockouts.
#4 SCREW
BACK COVER
2" BOX
CONDUIT
1A
2
3
4
1
5
1B
7
8
9
6
6
7
9
NOTE:
The adjustable bar is for studs that are 16" apart.
8
1.0
ELEC-BOX-2”
980BOX2IN
2” Electrical Box
3
5
4
2
G
P
I
:
ENERAL RODUCT NFORMATION
This product must only be used with LBL lighting systems.
Minimum volume of the electrical box must be 6 cubic inches (98
cubic centimeter).