LBL Lighting MEZZO PCF User Manual
Page 3
3
STRAIN RELIEF
NOTE:
It is recommended that one person hold the
fixture while the electrician finishes the installation.
CORD
SET SCREW
STRAIN RELIEF
HOUSING
Place all wires, wire nut connections, and the secondary
strain relief properly inside the electrical box.
Loosen the set screw on the primary strain relief.
Align the canopy center hole with the mounting plate
center hole.
Slide the canopy up against the ceiling and secure it in
place by tightening the primary strain relief into the
crossbar.
Do not turn the cord.
Push the cord into the canopy and line up the marked
point on the cord with bottom of the primary strain
relief.
Tighten the plastic set screw to secure the cord.
Screw the strain relief housing back onto the housing
cap.
2G
18
19
20
21
22
23
24
2F
10
2
13
2
14
2
15
16
15
Connect the yellow ballast wire to the insulated
pendant wire with the white tracer with a wire nut.
Connect the red ballast wire to the other insulated
pendant wire with a wire nut.
Connect the fixture and the crossbar ground wire to a
suitable ground in accordance with local electrical
codes.
Connect the white ballast wire to the neutral power line
wire.
Connect the black ballast wire to the hot power line
wire.
2
16
2
17
13
14
15
17
BALLAST