beautypg.com

Dake Model E-V Series User Manual

Page 7

background image

7/21/08

Manual V-16, V-24, VH-24, V-40 & VH-40

7 – Section I

MACHINE UNPACKING AND INSTALLATION

UNLOADING:

Remove the shrink-wrap covering the machine, carefully as not to damage painted

surfaces, electrical or hydraulic parts.

Carefully inspect the machine for physical damage. If

damage is noted, notify the truck line at once. They may require inspection, and that a claim is

filed.

Check that all standard accessories are with the machine. Some accessories may be boxed or

placed behind access doors or chip drawer. (See figure 2 & 3) The band saws are provided with lifting

eyes that screw into the top of the machine. These lifting eyes may be located in any of the

compartments shown by arrows in figure 1 & 2 above. Particular care should be taken in selecting

areas of the machine for handling, as electrical components and adjustment knobs can be marked up

or damaged.

WARNING: Machine table may NOT be used as a lifting point. Damage to the saw

and alignment problems could result.

Remove the mounting bolt nuts from the machine. Using the

lifting eyes, remove the machine from the skid and put in place. (See figure 1)

INSTALLATION

:

Location of the machine should take into consideration the ability to traverse

large work pieces. The machine is provided with holes in the base to anchor the unit to the floor.

Shims should be used to properly level the unit. The saw is shipped with an anti-rust protective coating

on machined metal surfaces. Surfaces should be cleaned with the appropriate solvent and then coated

with a light film of oil.

ELECTRICAL:

The machine is wired to be operated with an input voltage of 230, 3 phase, 60 htz

(+/- 10%) or with a Dake external step down transformer from 460v to 230v. If any adjustments or

changes are needed a qualified electrician should perform them. See detailed information as provided

in a circuit diagram #80587.