Vaisala TCI101 NiteStar User Manual
Page 17

PRM 10 - AREA CALCULATION NS-50/60
This determines the area for a fixed lane width over distance displayed.
Press PRM, 10, MARK/ENTR
PROMPT
INPUT
For FT/MI units
For KM units
_______________________________
LANE
Width in FEET
Width in 0.1 meters
(decimetres)
Enter correct width and press MARK/ENTR
~RESULT~
AREA
AREA in SQ yards
AREA in SQ meters
Depress PRINT to print results or MARK/ENTR to exit this calculation.
PRM 11 - VOLUME CALCULATION NS-50/60
For example, this is used to determine the volume of paving material.
For a given lane width, thickness of material and the distance; a volume
is computed. Insure the instrument is in the COUNT/HOLD mode.
Press PRM, 11, MARK/ENTR
PROMPT
INPUT
For FT/MI units
For KM units
__________________________________
LANE
Width in FEET
Width in 0.1 meters
(decimetres)
DPH (Depth)
Thickness in inches
Thickness in cm
~RESULT~
VOLUME in CU yards
VOLUM in CU meters
Depress MARK/ENTR key after each entry.
Press MARK/ENTR again, to exit this calculation.
PRM 12 - COST CALCULATION NS-50/60
This is used to estimate the cost of material for a job, the volume is cal-
culated as in PRM 11 and then is multiplied by a cost/cu yd or cost/cu
m. This yields a cost for the volume of material used. Insure instrument
is in COUNT/HOLD mode.
Press PRM, 12, MARK/ENTR
PROMPT
INPUT
For FT/MI units
For KM units
___________________________________
LANE
Width in FEET
Width in 0.1 meters
(decimetres)
DPH (Depth) Thickness in in
Thickness in cm
PRCE(Price) Material cost (e.g. $/cu unit) * 100
(If the cost was $3.46 / cu yd input 346)
~RESULT~
JOB-
Distance * width * thickness * cost = $
(amount in cost units i.e. $’s).
Depress MARK/ENTR key after each entry, press MARK/ENTR again to
exit this calculation.
30
PRM 13 - TONNAGE CALCULATION NS-50/60
This is used to estimate the amount of material for a project, the vol-
ume is calculated as in PRM 11 and then is multiplied by lb/cu yd or
kg/cu m. This yields an estimate of the number of tons of material
needed. Insure instrument is in COUNT/HOLD mode.
Press PRM, 13, MARK/ENTR.
PROMPT
INPUT
For FT/MI units
For KM units
__________________________________
LANE
Width in FEET
Width in 0.1 metres (decimetres)
DPH
Thickness in in
Thickness in cm
DEN
Material Density in lb/cu yd or kg/cu m.
If material density given in lb/sq yd * in
multiply by 36 to get lb/cu yd. If in kg/sq m *
cm multiply times 100.
~RESULT~
FILL
Distance * width * thickness * density = mass
result in tons (metric or English).
Depress MARK/ENTR key, to exit this calculation.
PRM 14 - TONNAGE COST NS-50/60
This is used to estimate the cost of material for a job, the volume is cal-
culated as in PRM 11 and then is multiplied by lb/cu yd or kg/cu m.
This yields an estimate of the number of tons of material needed. Then
you input a cost/ton value. Insure instrument is in COUNT/HOLD mode.
Press PRM, 14, MARK/ENTR.
PROMPT
INPUT
For FT/MI units
For KM units
__________________________________
LANE
Width in FEET
Width in 0.1 metres (decimetres)
DPH(Depth) Thickness in in
Thickness in cm
DEN
Material Density in lb/cu yd or kg/cu m.
If material density given in lb/sq yd * in
multiply by 36 to get lb/cu yd. If in kg/sq m *
cm multiply times 100.
PRCE(Price) Material cost (e.g. $/ton) * 100
(If the cost was $3.46 / ton input 346)
~RESULT~
JOB
Distance * width * thickness * density * cost = $
amt result in $ or currency units.
Depress MARK/ENTR key after each entry and press MARK/ENTR
again to exit this calculation. --- The NITESTAR will remember your
inputs so you won’t have to input the constants such as lane width or
cost each time. When the result is displayed it will stay until you press
the MARK/ENTR key. After that the original distance is restored.
31