Maintenance checklist – Ashland I-200TS4 ver 0612 User Manual
Page 24

Ashland Scrapers
Ph: (715) 682-4622 Fx: (715) 682-9717
www.AshlandInd.com
22
Maintenance Checklist
1. Grease all zerks.
• After every 8 hours of operation.
• See Lubrication Points section on next page.
2. Grease the hubs.
• Re-pack wheel bearings after 300 hrs of operation.
• Completely clean grease out of hub and bearings after every 1,200 hours
of operation.
3. Check tire pressure.
• 20.5 x 25, 12 ply tires require a tire pressure of 35-40 PSI on a rear tire.
4. Check all pins for signs of wear.
• Daily
5. Check wheel lug nut torque.
• After first 2 hours of operation.
• Recheck daily for next 2 weeks.
• Tighten wheel lug nuts in a star pattern.
• Torque wheel lug nuts to 120-130 ft-lbs.
6. Check and retighten all bolts.
• After first 10 hours of use.
• Again after 50 hours of use.
• See Torque Specifications on next page.
7. Inspect cutting edges.
• Daily.
• Replace cutting edges when center blade has been worn to approximately
6” and side edges are worn to approximately 4”.
• CAUTION! Failure to replace worn cutting edges may result in
unnecessary wear to the earthmover sides and floor.
• Note: Please specify left or right “L” shaped cutting edges when ordering
replacements. Left or right side parts are determined by viewing from rear
of the scraper.