Installation instructions, 67(3 install hood, Step 7 connect duct – GE ZV54ISHSS User Manual
Page 16
16
49-80209-5
Installation Instructions
67(3 ,167$//'8&775$16,7,21
WITH DAMPER
IMPORTANT: Remove shipping tape from damper
and check that damper moves freely.
• Place the transition piece over the hood exhaust
and secure with 4 Screws C provided.
• Use duct tape to seal the connection. Check to be
sure the damper moves freely.
67(3
INSTALL
HOOD
Note: THREE PEOPLE ARE REQUIRED TO COMPLETE
THIS INSTALLATION!
• Back out the hanging screws on the bottom of the
support frame to a 1/4” gap.
• Lift the hood up to the support frame. Carefully
align the hood keyhole to the screws on the support
frame. Slide the hood to engage the keyhole slots.
• Tighten the screws.
Duct
Transition
Bumper Pads
Attachment
Screws
Attachment
Keyholes
1/4" Gap
Install
2 Safety
Screws
Screws C
STEP 7 CONNECT DUCT
• Loosen duct collar and slide down to cover
gap between
transition and
house duct.
Tighten collar
screws and tape
all joints.
• Seal all
connections with
duct tape.
Note: Do not drive screws through this duct
connection. Doing so will prevent proper damper
operation.
Screws C
• Install safety screws into the top of the hood as
shown.
• Check hood level in both directions.
Slide Duct
Collar Down
to Cover Gap