Installing hardware options, Installing servers – HP 60-Modular-Smart-Array User Manual
Page 19
Setup 19
If you are installing the storage enclosure into a telco rack, order the appropriate option kit at the
RackSolutions websit
instructions on
enclosure.
Item Description
1
Power supply 1
2
Fan module 1
3
Dual 7-segment display board (for box ID numbering)
4
SAS in connector
5
SAS out connector
6
I/O module bay
7
For future use
8
Fan module 2
9
Power supply 2
Installing hardware options
Install any hardware options before initializing the storage enclosure. For options installation information,
refer to the option documentation. For storage enclosure-specific information, refer to "Hardware Options
Installing servers
Install the servers in the rack directly above the storage enclosure. Refer to the server documentation.
NOTE: When installing servers, HP recommends installing all storage enclosures at the bottom of the rack.
To optimize cabling access, avoid interleaving the storage enclosure and server products.