VF BOILER SERVICE MANUAL

AOS WPC - Tech Training

40 of 72

Ashland City, TN © 2007

Servicing should only be performed by a Qualified Service Agent

PDB - POWER SUPPLY TEST

The lower right corner of the PDB also contains two jumpers and three power supply status
LED lights. With power applied the green DS2 LED should always be lit. The JP1 jumper is
used to activate a power supply test function. The JP2 and JP3 jumpers are used for
manufacturing purposes only.

Power Test Procedure:

Turn power off to the boiler at the breaker or disconnect switch. Disconnect the wiring plugs
at J1, J2, and J3 Sockets on the PDB. Relocate jumper JP1 from the “Run” pins to the “Test”
pins (see pages 38 and 39). Turn power back on and note which LEDs are illuminated. If the
power supply is properly connected the Yellow and Green LEDs should be illuminated and
the red LED should be off. If any other combination of LEDs are illuminated refer to the table
below for the problem indicated and what corrective action must be taken.

Note:

The JP1 jumper should be in the run position during normal operation. Leaving the jumper in the test mode
when operating the system may cause trouble with Ground Fault Interrupters.

The wire harnesses that normally connect to J1, J2, & J3 should be disconnected while performing this test.
Leaving them connected will not cause damage but the status indicated by the LED's will be incorrect.

LINE CONNECTION STATUS

DS1 YELLOW LED

DS2 GREEN LED

DS3 RED LED

Proper Connection

ON

ON

OFF

Open Ground

OFF

ON

OFF

Reverse Polarity

OFF

ON

ON

Open Hot

OFF

OFF

OFF

Open Neutral

ON

ON

ON

Reverse Hot & Ground

ON

OFF

ON

Hot wire on Neutral connect & Open

Neutral wire

OFF

OFF

ON

D

DS1

Yellow

DS2

Green

DS3

Red

JP1

JP3 Jumper

Should be on - removed

during manufacturing only

Test

Run

JP1 Jumper

Power Test Jumper