beautypg.com

Secondary system board (processors 3 and 4), Installing dimms – HP ProLiant BL45p Server series User Manual

Page 37

background image

Hardware options installation

37

Secondary system board (processors 3 and 4)

Item Description

Memory

bank

1-2

DIMM slots 9 and 10

Processor 3 memory bank 1

3-4

DIMM slots 11 and 12

Processor 3 memory bank 2

5-6

DIMM slots 13 and 14

Processor 4 memory bank 1

7-8

DIMM slots 15 and 16

Processor 4 memory bank 2

Installing DIMMs

To install the component:

1. Power down the server blade (on page

22

).

2. Remove the server blade (on page

22

).

3. Remove the access panel.

4. Open the DIMM slot latches.