Availability group – HP ProLiant DL980 G7 Server User Manual
Page 24

Table 3 Possible Mirror Status Values (continued)
Description
Value
The principal database and the mirror database are disconnected.
Disconnected
The principal database and the mirror database are in the process of synchronizing.
Synchronizing
The principal database is initiating a failover.
PendingFailover
The principal database and the mirror database are synchronized.
Synchronized
Availability Group
If a database is a member of an Availability Group, additional parameters will be displayed for
Availability Group Name (along with Replica Role) and Synchronization Status, as shown in the
figure below.
Figure 25 Database in Availability Group
Table 4 Possible Synchronization Status Values
Description
Value
The synchronization state is Not Synchronizing.
NotSynchronizing
The synchronization state is Synchronizing.
Synchronizing
The database replica is synchronized with the primary.
Synchronized
The database replica is reverting after a failover.
Reverting
The principal database is initiating a failover.
Initializing
Table 5 Possible Replica Roles
Description
Role
The Role is Resolving.
Resolving
The Role is Primary.
Primary
24
Using HP ESO