beautypg.com

Setting background task rate – AMCC 3WARE 720-0138-00 User Manual

Page 83

background image

Background Tasks

www.3ware.com

75

Cancelling a Rebuild and Restarting It with a

Different Drive

You can cancel a rebuild by using the

Remove Drive

link on the

Maintenance page.

Setting Background Task Rate

In 3DM, you can set the relative performance of background tasks
(initializing, rebuilding/migrating, and verifying) in relation to normal I/O
activity (reading and writing to disk).

Controllers can have separate settings for Rebuild/Migrate Rate and Verify
Rate. (Initialization occurs at the Rebuild rate.)

To change the background task rate

1

Choose

Management > Controller Settings

from the menu bar.

2

In the

Background Task Rate

section of the Controller Settings page,

select one of the five radio buttons to indicate the relative task rate for
Rebuild and Verify Tasks.

The furthest left buttons set the firmware to the fastest rebuild and verify
settings. This means that maximum processing time will be given to
rebuilds or verifies rather than I/O. The furthest right buttons set the
firmware to the slowest rebuild and verify settings, giving maximum
processing time to I/O.

After you select one of the radio buttons, the page refreshes, and a
message at the top confirms the change you have made.

Note:

If you want to pause the rebuild process through 3DM, you can do so by

setting or changing the rebuild schedule on the Scheduling page. If you set a
schedule for rebuilds that does not include the current time, the rebuild process will
pause.