Maintenance & testing, 0 maintenance & testing – American Power Conversion 240-320kW 480V User Manual
Page 28

28
User Guide APC Silcon 240-320kW 480V UPS
990-4039
Maintenance & Testing
6.0 Maintenance & Testing
UPS maintenance should be carried out by trained service engineers only. Service and
maintenance contract is recommended.
6.1
Fan
It is recommended to replace fans every 3 years.
6.2
Battery Monitoring Test
Systems with built-in batteries have a standard battery monitoring feature (optional in other
systems).
Battery Test Results:
1. Battery OK. Back-up time normal.
2. Reduced battery capacity - “Battery weak” .
3. Battery capacity too low - “Battery defective”
Carry out battery monitoring test by discharging max. 25% of battery energy. For systems with
no battery monitor/no excess back-up time, a battery capacity test is recommended every 6
months.
Carry out battery tests when load is least affected.
6.3
Battery Capacity Test
CAUTION!
Allow 16 hours to restore full back-up time after battery capacity tests
- 5000VA (25 pages)
- MX28B-400 (46 pages)
- CTEG4-240MB-5 (7 pages)
- 200/208 V (52 pages)
- VS 100 (54 pages)
- SMARTUPS 700 (60 pages)
- AP7562J (24 pages)
- 100VAC (18 pages)
- Smart-UPS VT (56 pages)
- 1400XLT (30 pages)
- 350/550 (2 pages)
- SURTA1500XLJ (16 pages)
- RT-UXI (20 pages)
- 2200 VA (17 pages)
- 208 Vac (17 pages)
- 1500VA (18 pages)
- Smart-UPS (36 pages)
- 60-80kW 208/480V (34 pages)
- 420 (3 pages)
- 220 VAC (21 pages)
- 350 (2 pages)
- AP9215 (20 pages)
- Back-UPS CS 500 (2 pages)
- PDU (54 pages)
- Airless Paint Sprayer 68001 (24 pages)
- AP7610 (16 pages)
- AP7902 AP7911 (26 pages)
- UPS (2 pages)
- RT XLI/XLICH (34 pages)
- 990-2233A (19 pages)
- 208/220 (48 pages)
- NS 600 (2 pages)
- SYMF800KH (54 pages)
- 20-30 kVA 480V (4 pages)
- 100 VAC (25 pages)
- 750 (17 pages)
- 3000 (23 pages)
- MX28B200 (61 pages)
- RS 1000 (2 pages)
- 200-240 VAC (21 pages)
- 5000RMB (23 pages)
- 480kW400V (32 pages)
- AP9825I (1 page)
- 250/450 (2 pages)
- SUA48RMXLBP3U (8 pages)