beautypg.com

Water Inc HOUSEPURE HP04 User Manual

Page 8

background image

15.

Allow unit to run to drain for the duration of the cycle. 10 minutes.





Figure 4

With the valve In Service, manually initiate a backwash as the final installation
step. This backwash will:


a) Complete the final flushing and filtering of the water system.
b) Re-classify the media bed if the bed was disturbed during shipping.
c) Rinse any remaining residue from lines.












This manual is related to the following products: