beautypg.com

Tower installation – APC Smart-UPS URTA48XLBPJ User Manual

Page 3

background image

Tower Installation

Smart-UPS RT SURTA48XLBP/SURTA48XLBPJ External Battery Pack User Manual

3

Tower Installation

1. Complete this step if this is a new installation of the UPS with battery pack(s).

a. Place the UPS on its side to remove the battery. To remove the battery, refer to the “Battery

Replacement Instructions” procedure in the UPS user manual.

b. Remove the stabilizing feet  and top cover . Retain removed components for reuse.

c. Join the equipment together as shown.

• Assemble the stabilizing feet  and foot extensions .
• Place the UPS  on top of the battery pack.
• Attach the stabilizing feet , clips , and top covers .

d. Place the equipment in an upright position.

Caution

When installing the UPS and battery pack(s) as a tower configuration, they must

be joined together with stabilizing feet and clips. Failure to comply to this

instruction may result in bodily injury or equipment damage.

Note

When installing the UPS and battery pack(s) as a tower configuration, battery pack(s)
must be installed to the right of the UPS when facing the front of the UPS. Failure to
follow this instruction could result in cabling shortage.

x2

x2

x4

x2

x2