Prochem Legend GT User Manual
Page 13
11
Installation
Bolting Down Unit And Waste Tank
NOTE: When positioning waste tank with respect to
console, hook up the vacuum hose to waste tank.
This will ensure that waste tank is positioned
correctly. Proceed once unit and waste tank are
positioned in vehicle in desired location.
Before drilling any mounting holes in vehicle floor,
make certain that when drilling, you will not do any
damage to fuel tank, fuel lines, or any vital
component which might affect operation or safety
of vehicle.
1. Using console and waste tank mounting holes as a
template, drill six 13/32" diameter holes for
mounting console and six more 13/32" diameter
holes for mounting waste tank.
2. Using installation hardware kit:
a. Insert six 3/8-16 x 2" hex head cap screws with
flat washers through mounting holes in console,
and six 3/8-16 x 2" hex head cap screws with flat
washers through mounting holes in waste tank.
b. Install mounting plates underneath vehicle floor.
c. Screw 3/8-16 hex head locknuts on mounting
screws and tighten them until console and waste
tank are firmly secured to vehicle floor.
Electrical Wiring
Ensure all electrical wiring and battery cables are free
from contact with any metal edge. Engine vibration
could cause metal edge to cut wiring and possibly
result in a fire. Be aware of where battery cables are
run.
86313050 LEGEND GT