Dwyer CPS User Manual
Page 3
WIRE CUP
CABLE
MOUNTING
BASE
FRAME OF BELT
CONVEYOR
6˝
8.25˝
4.5˝
Installation
Eye bolts should be prepared before installation, and should be
spaced according to the cable length (Figure 2). A single pull
cord up to 50 feet should have an eye bolt mounted every 10
feet. When using a single pull cord up to 75 feet there should be
an eyebolt every 3 feet. The maximum length of cable between
CPS is 75 feet (Note: Variations in temperature will cause cable
to expand and contract). The ideal cord is a steel cable 0.25
inches in diameter. Figure 3 is a typical installation of a CPS.
CONVEYOR BELT FRAME
EYE BOLTS
CABLE
Fig. 2 Installation of Eye Bolts
Fig. 3 Typical Installation of CPS
PC-CPS-1:TEMPLATE 7/10/09 10:11 AM Page 3
See also other documents in the category Dwyer Sensors:
- DPMX (2 pages)
- DPMP-4 (2 pages)
- DPMP-5 (2 pages)
- DPML-4 (2 pages)
- DPML-5 (2 pages)
- DPMW (2 pages)
- MPM (36 pages)
- SPPM-HSG (1 page)
- SPPM (4 pages)
- SPPM-C (4 pages)
- A-SPPM-TC (2 pages)
- ULB (18 pages)
- CRF2 (4 pages)
- CLT (2 pages)
- PBLT2 (1 page)
- PBLTX (4 pages)
- SBLT2 (1 page)
- SBLTX (4 pages)
- MBLT (2 pages)
- FBLT (2 pages)
- ULT (8 pages)
- UTC (20 pages)
- ULTM (20 pages)
- ULSL (30 pages)
- 1500 (16 pages)
- 2600 (52 pages)
- 2500 (16 pages)
- 16A (1 page)
- 16A (44 pages)
- 1600 (8 pages)
- 1600 (36 pages)
- 8600 (40 pages)
- 8C (6 pages)
- 32B (32 pages)
- SCZ10 (20 pages)
- 8C (24 pages)
- 32A (36 pages)
- 32DZ (40 pages)
- SCD (10 pages)
- SCD-PS (2 pages)
- SCD-8 (2 pages)
- SCD-LED (2 pages)
- 650 (2 pages)
- 651 (2 pages)
- 659RTD (2 pages)