Crystal nVision Lab Reference User Manual
Page 2
![background image](/manuals/371552/2/background.png)
4119.D
© 2013 Crystal Engineering Corporation
708 Fiero Lane, Suite 9, San Luis Obispo, California 93401-8701
12.0 m
m
4.0 mm
Lubricate here with
DOW 111 (See Step
4
)
Wiring connection hardware
may vary.
(d)
Install your RTD sense element wires as appropriate for your configura-
tion (see illustration below), and tighten the set screws.
(e)
Confirm correct orientation of element wires in connected state.
2-wire 3-wire 4-wire
4
Lubricate o-ring and thread system with Dow 111 or equivalent in location
near terminal block as required to prevent water intrusion when connector
shell is installed. Thread shell in place until tight.
5
Leak check to ensure water tight seal. If any leaking occurs, rework and
lubricate as necessary. If leak-free, your RTD sensor is ready to use with the
nVision Reference Recorder.
Note:
Your nVision has the RTD100 module TCR set to
Pt100 (385) Euro. Modify this setting in CrystalControl as needed.