A.O. Smith VB/VW- 1000 User Manual
Page 6

6
This design complies with the current edition of the ANSI
Z21.13 low-pressure boiler standard.
Compliance under this standard implies that when the boiler
underwent test, the gas manifold and control assembly pro vided
on the boiler met safe lighting and other performance criteria.
Detailed installation diagrams are found in this manual. These
diagrams will serve to provide the installer a reference for the
materials and methods of piping necessary. It is essential that
all water, gas piping and wiring be installed as shown on the
diagrams. You should thoroughly read and understand this
manual before installation and/or operation of this boiler.
The factory warranty will be void if the boiler(s) have been
improperly installed or operated.
AL 29-4C
®
is a registered trademark of Allegheny Ludlum
Corporation.
In addition to these instructions, the boiler(s) shall be installed in
accordance with those installation regulations in force in the local
area where the installation is to be made. These shall be carefully
followed in all cases. Authorities having jurisdiction should be
consulted before installations are made.
In the absence of local codes, the installation must comply with
the current editions, as follows:
In the United States:
The National Fuel Gas Code, ANSI Z223.1/NFPA 54 and the
National Electric Code, NFPA 70.
CONTENTS
INTRODUCTION
SAFE INSTALLATION, USE AND SERVICE ...........................................2
DIMENSION AND CAPACITY DATA .........................................................4
CAPACITY AND FLOW DATA ....................................................................5
Inlet Water Considerations ......................................................................7
Liquefied Petroleum Gas Models ..........................................................7
Field Installed Components ....................................................................7
CONTROL COMPONENTS .........................................................................8
The Control System ................................................................................8
Water Temperature Limit Controls .........................................................9
Temperature Probes ................................................................................9
Low Water Cutoff (Optional) ..................................................................9
Panels and Covers ................................................................................10
Chemical Vapor Corrosion .................................................................... 11
Fresh Air Openings for Confined Spaces .......................................... 11
Outdoor Air Through Two Openings ...................................................12
Outdoor Air Through One Opening ....................................................12
Outdoor Air Through Two Horizontal Ducts .......................................12
Outdoor Air Through Two Vertical Ducts ...........................................12
Air From Other Indoor Spaces............................................................13
Termination Clearances Sidewall Power Vent ...................................14
Termination Clearances Sidewall Direct Vent ....................................15
Special Installation Considerations .......................................................16
.......................................................16
General Exhaust Vent Installation Procedure ....................................16
Connecting Vent to Boiler ....................................................................16
Vertical Installation Requirements ........................................................17
Horizontal Installtion Requirements ......................................................17
Direct Vent Installation Requirements .................................................19
INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF
SYSTEM INSTALLATION ..........................................................................22
Hot Water Heating (Hydronic) Equipment ..........................................22
Internal Contaminants ............................................................................23
Hot Water Supply Boiler System - General Water Line Connections ...23
Hard Water Conditions ..........................................................................23
Thermal Expansion (Closed System) ..................................................23
Remote Probe Installation Procedure .................................................23
Gas Supply Line Sizing ........................................................................24
SUGGESTED PIPE SIZING TABLES .....................................................29
VB/VW-500, 750 & 1000 SCHEMATIC DIAGRAM ...............................32
Filling and Purging of Heating Boiler Installation..............................33
Filling Hot Water Supply Boiler Installation .......................................33
Water Temperature Regulation .............................................................34
LIGHTING & OPERATION INSTRUCTIONS ..........................................36
Setting of the Test Mode .....................................................................37
Operating Sequence ..............................................................................39
UIM Operating Procedures ...................................................................40
Operating Setpoint Adjustment Procedure ..........................................41
High Limit Differential Setpoint Adjustment Procedure .....................42
TROUBLESHOOTING IGNITION SYSTEM ............................................44
Troubleshooting Gas Valve ...................................................................45
PREVENTATIVE MAINTENANCE .............................................................45
Blower Compartment .............................................................................46
Burner Maintenance ...............................................................................46
Condensate Removal System ..............................................................46
Venting Maintenance .............................................................................47
Heat Exchanger Preventative Maintenance ........................................47
Tube Cleaning Procedure Mechanical Removal of Deposits ..........47
Replacement Parts ................................................................................47
LIMITED WARRANTY ................................................................................51