10 r – Detcon 1010SS-N4X User Manual
Page 8

1.8 S
PARE
P
ARTS
L
IST
Refer to Saudi Aramco SPDP document for a completet list of spare parts.
1.9 W
ARRANTY
Detcon Inc., as manufacturer, warrants under intended normal use each new Model 1010SS-N4X NEMA 4X control
enclosure to be free from defects in material and workmanship for a period of one year. The warranty period begins
from the date of shipment to the original purchaser and ends one year thereafter. All warranties and service policies
are FOB the Detcon Inc. facility located in The Woodlands, Texas.
1.10 R
EFERENCE
D
RAWINGS
Aramco H2S Gas Monitoring Panel
Component Layout 3
Drawing #4146 (3 of 3)
Revision 1
Aramco H2S Gas Monitoring Panel Wiring Diagram
3 Channel Drawing Drawing #4098
Revision 6
4 Channel Drawing Drawing #4119
Revision 6
5 Channel Drawing Drawing #4121
Revision 6
6 Channel Drawing Drawing #4120
Revision 6
Model 1010SS-N4X NEMA 4X Control Enclosure PG.8
Shipping Address: 3200 A-1 Research Forest Dr., The Woodlands, Texas 77381
Mailing Address: P.O. Box 8067, The Woodlands, Texas 77387-8067
phone 888-367-4286, 281-367-4100 • fax 281-292-2860 • www.detcon.com • [email protected]