Basic operation connection, Remark, Vent and positive pressure preparation – Additel 901 Low Pressure Test Pump User Manual User Manual
Page 2: Increasing pressure, Decreasing pressure, Vacuum preparation increasing vacuum pressure, Decreasing vacuum pressure, Close ②operate it to approach the desired value, Fine adjust, Close

A
SW V mA COM 24V
SW V mA COM 24V
SW V mA COM 24V
k
Basic Operation
Connection
dial gauge
pressure switch
pressure transmitter
flexible hose
Pressure Gauge
DIGITAL PRESSURE CALIBRA
TOR
Units
A
0
25
50
75
100
0
0
0
k
D
k
0
DIGITAL PRESSURE
CALIBRATOR
Units
A
0
25
50
75
100
0
B
①open
②Turn all the way out
③set it to the mid position of its travel
DIGITAL PRESSURE CALIBRA
TOR
Units
A
0
25
50
75
100
0
0
0
k
C
①Close
②operate it to
approach the
desired
value
Vent and positive
pressure preparation
Zeroing should be
operated under
this condition only.
Increasing pressure
③fine adjust
Decreasing pressure
①operate it to
approach the
desired
value
②fine adjust
Pressure Gauge
Pressure Gauge
Pressure Gauge
DIGITAL PRESSURE
CALIBRATOR
Units
A
0
25
50
75
100
0
5
10
15
20
-25
k
E
k
0
5
10
15
20
-25
F
②Turn all the
way in
①open
③set it to the mid position of its travel
②operate it to
approach the
desired
value
①
close
k
0
5
10
15
20
-25
G
Remark:
A Additel has made a concerted effort to provide complete and current information for the proper use of the equipment. The product
specifications and other information contained this manual are subject to change without notice.
B
:
: Above pictures are just for reference.
Vacuum preparation
Increasing vacuum pressure
③fine adjust
Decreasing vacuum pressure
operate it to
approach the
desired
value
①
②fine adjust
Vacuum Gauge
Vacuum Gauge
Vacuum Gauge
Vacuum Gauge
Vacuum Gauge
Vacuum Gauge
k
DIGITAL PRESSURE CALIBRATOR
Units
A
0
25
50
75
100
DIGITAL PRESSURE
CALIBRATOR
Units
A
0
25
50
75
100
DIGITAL PRESSURE
CALIBRATOR
Units
A
0
25
50
75
100