beautypg.com

SANDPIPER M05 Metallic User Manual

Page 29

background image

m05mdl1sm-rev0711

Model M05 Metallic Page 27

INTERMEDIATE REPAIR PARTS lIST

ITEM PART NUMBER DESCRIPTION

QTY

4

114-023-157

Bracket, Intermediate

1

114-023-551

Bracket, Intermediate

1

114-023-559

Bracket, Intermediate

1

(Conductive Polypropylene Midsection ONLY)

7

135-036-506

Bushing, Plunger

2

28

560-001-360

O-Ring

2

32

620-019-115

Plunger, Actuator

2

33

675-042-115

Ring, Retaining*

2

*NOTE: It is recommended that when plunger components are

serviced, new retaining rings be installed.

7

26

21

4

21

7

26

25

25

35

Intermediate Assembly Drawing

Intermediate Assembly Servicing

Read these instructions

completely, before in-

stallation and start-up.

It is the responsibility of

the purchaser to retain

this manual for reference. Failure to

comply with the recommendations stated

in this manual will damage the pump, and

void factory warranty.

IMPORTANT

ACTUATOR PlUNGER SERVICING

To service the actuator plunger first

shut off the compressed air supply,

bleed the pressure from the pump, and

disconnect the air supply line from the

pump.

Step #1: See PUMP ASSEMBLY

DRAWING.

Using a

3/8

" wrench or socket,

remove the four capscrews (items 12).

Remove the air inlet cap (item 8) and

air inlet gasket (item 20). The pilot valve

assembly (item 3) can now be removed.

Step #2: Servicing the actuator

plungers.

See PUMP ASSEMBLY DRAWING.

The actuator plungers (items 32)

can be reached through the stem cavity

of the pilot valve in the intermediate

bracket (item 4). To service bushings,

o-rings and retaining rings, see

Intermediate Drawing.

Remove the plungers (items 32) from

the bushings (item 7) in each end of the

intermediate cavity. Inspect for wear or

damage. Replace plunger as needed.

Apply a light coating of grease to each

o-ring and re-install the plungers in to

the bushings. Push the plungers in as

far as they will go.

Step #3: Re-install the pilot valve

assembly into the intermediate

assembly.

Be careful to align the ends of

the stem between the plungers when

inserting the stem of the pilot valve into

the cavity of the intermediate.

Re-install the gasket (item 20),

air inlet cap (item 8) and capscrews

(items 12).

Connect the air supply to the pump.

The pump is now ready for operation.

PlUNGER BUSHING, O-RING, AND

RETAINING RING SERVICING

To service the plunger bushing

components first remove the two

retaining rings (items 33) using a

small flat screwdriver.

*Note: It is

recommended that new retaining rings

be installed.

Next remove the two plunger

bushings (items 7). Inspect the bushings

for wear or scratches. Replace the

bushings as necessary.

Inspect the two o-rings (28) for cuts

and/or wear.