Assembly instructions, Shed house style 8 x 8 x 8 – Rhino Shelter SHED-8W X 8L X 8H User Manual
Page 2
![background image](/manuals/364136/2/background.png)
Assembly Instructions
Shed House Style 8 x 8 x 8
V1.0
Do NOT Return Assembly To Dealer or Store. For All Questions or Shortages Please Call MDM Products Directly
Customer Service 800-447-7079 or 203-877-7070
10 19
3/8”
Curved
Washer
11
4
3/8” Flat Washer
12 23
3/8”
Locknut
13
10
1” Plastic End Plugs
14
4
1 5/8” Plastic End Plugs
15 2 3/16”
Rope
16
4
Bungee Cord Hold Ups
17 4 Earth
Cable
Anchors
18
4
U Bolts with Nuts
19 1 36”
Drive
Rod
20
2
Door End Panels
21 1 Main
Cover
22 8 Turnbuckles
Site Preparation
Select a level or as close to level as practical location for
your MDM Products unit. The unit should be placed on a
base of materials suitable for the storage load to be
protected. The unit should not be located under trees,
which will shed hard fruit such as apples, walnuts, or
heavy pine cones. The cover of your unit will protect
against normally leaves and light debris, however large
branches or other falling items may cause puncture or
tears in the cover material.
Take notice of drainage around your intended location.
Water draining from the surrounding terrain should be
planned so that it does not run into the unit. As well, rain
or melting snow that comes off the unit should be drained
away rather than accumulate and pool around the unit.
Check to be certain that adequate clearance is allowed for
entry and exit from ends of unit. As unit has different door
openings on each end, ideally contents can be inserted or
removed from either end.
Frame Assembly
Step1. Assemble the Front and Rear End Arches(2) using
(1) Top Crest #2, (2) Bent Tube Side Crest #1 and (2) End
Upright w/Foot #3 for each one. Use (4) #8 carriage bolts
with nuts and washers through pre-drilled holes in frame
members.
P
u
a
End Upright
with Foot
Wind Brace
Bottom Cross Rail
Bent Tube Side Crest
Top Crest
Straight Side Upright
Side Cross Rail
Top Ridge Rail