beautypg.com

Rigging procedure – Nexo STM Series User Manual

Page 7

background image


7

RIGGING PROCEDURE

Procedure description

Install XBOW on to each top
module, lock into place with two
spring locks and rear steel pin.

If 2 or 3 columns: join XBOW’s
together at front and rear with
XCOUP2 or XCOUP3 coupling bars,
and secure in place with steel pins.
Insert MBEAM at the middle of the
XCOUP2 or XCOUP3 coupling bars,
and secure in place with spring locks.

Install top rigging components as in
page 4, including laser inclinometer
and Compression Chain or Chain
Lever Hoist.

Attach motor(s) and lift

Connect subsequent STM modules
(refer page 5)

Once all modules are connected,
install

BTBUMPERs

underneath

bottom modules, align side-pins, and
push “REDLOCK” to the “LOCK”
Position
Connect BTBUMPERs to bottom
module piston and secure in place
with locking pin.

If

2

or

3

columns:

join

BTBUMPER’s

together

with

BCOUP2 or BCOUP3 coupling bar.

Attach Compression Chain or Chain
Lever Hoist to BTBUMPER or
BCOUP2 or BCOUP3 center point.

Before applying compression, ensure
all piston locking handle are in
“OPERATION” position – ie vertical
– and all angles set at correct value.

If 2 motors: bring the array angles to
compression with rear motor or
Chain

Lever

Hoist,

ensure

compression is fully applied on all
cabinets, fly STM to operating height
and adjust bumper angle with motors

If 1 motor: bring the array angles to
compression and adjust bumper angle
with Chain Lever Hoist, ensure
compression is fully applied on all
cabinets, fly STM to operating
height.

2 motors, Kelping beam and Compression Chain

2 motors and Chain lever Hoist

1 motor and Chain Lever Hoist