Rigging procedure – Nexo STM Series User Manual
Page 7

 
 
7
RIGGING PROCEDURE
Procedure description
•
Install XBOW on to each top 
module, lock into place with two 
spring locks and rear steel pin. 
•
If 2 or 3 columns: join XBOW’s 
together at front and rear with 
XCOUP2 or XCOUP3 coupling bars, 
and secure in place with steel pins. 
Insert MBEAM at the middle of the 
XCOUP2 or XCOUP3 coupling bars, 
and secure in place with spring locks. 
•
Install top rigging components as in 
page 4, including laser inclinometer 
and Compression Chain or Chain 
Lever Hoist. 
•
Attach motor(s) and lift
•
Connect subsequent STM modules 
(refer page 5) 
•
Once all modules are connected, 
install 
BTBUMPERs
underneath
bottom modules, align side-pins, and 
push “REDLOCK” to the “LOCK” 
Position 
Connect BTBUMPERs to bottom 
module piston and secure in place 
with locking pin. 
•
If
2
or
3
columns:
join
BTBUMPER’s
together
with
BCOUP2 or BCOUP3 coupling bar.
•
Attach Compression Chain or Chain 
Lever Hoist to BTBUMPER or 
BCOUP2 or BCOUP3 center point. 
•
Before applying compression, ensure 
all piston locking handle are in 
“OPERATION” position – ie vertical 
– and all angles set at correct value. 
•
If 2 motors: bring the array angles to 
compression with rear motor or 
Chain 
Lever
Hoist,
ensure
compression is fully applied on all 
cabinets, fly STM to operating height 
and adjust bumper angle with motors 
•
If 1 motor: bring the array angles to 
compression and adjust bumper angle 
with Chain Lever Hoist, ensure 
compression is fully applied on all 
cabinets, fly STM to operating 
height. 
2 motors, Kelping beam and Compression Chain
2 motors and Chain lever Hoist
1 motor and Chain Lever Hoist
