Stuart Turner 12/50 12 V User Manual
Page 8

- 8 -
5. Starting
a) Switch on power to the pump which will now be operational.
b) Confirm the direction of rotation is correct by stopping and observing over run.
The correct direction of rotation is anticlockwise when looking directly at the front
of the pump casing. To reverse rotation see wiring diagram section.
c) The pump should now be fully operational.
d) Carefully check pump and pipework for leaks whilst pump running and stationary
before leaving the installation unattended.
For Further Technical Support
Phone the Stuart Turner Pump Assist team on 0844 98 000 97. Our staff are trained to
help and advise you over the phone or arrange for a service engineer to call.
Note: When pumps are installed in another manufacturers original equipment, please
contact the manufacturer for advice.
MAINTENANCE
WARNINGS:
Care should be taken to protect the pump from frost and
freezing.
Pump Location
If possible site the pump in a location where in the unlikely
event of a liquid leak, any spillage is contained or routed to
avoid electrics or areas sensitive to water damage.
1. Routine maintenance to replace motor brushes will be required, provision should be
made for easy access to the pump to allow repairs due to normal wear and tear
and brush replacement.
2. Disconnect electrical supply before working on pump.
3. Turn off liquid supplies to the pump and release pressure by opening outlets before
attempting
maintenance.
Fig. 2
Fig. 3
Priming
Plug
Without Priming Plug
With Priming Plug