5 COMMISSIONING

5.11

System Flushing

This pump incorporates push-in connectors and plastic

components that must not come into contact with solder flux,

acid-based descalents or aggressive cleaning agents. The

pipework system should be flushed out prior to the pump being

connected to ensure any contaminants/chemical residues and

foreign bodies are removed from elsewhere in the system.

5.12

Water Supply: Always ensure that water storage capacity is adequate to meet

the demand. Ensure the pump chamber is full of water before starting the pump.

Failure to do this could result in seal damage. To ensure dry running does not

occur the pump must be primed as described in priming section below.

Do not run pump dry.

5.13

Priming/starting:

a) Ensure all outlets are closed, turn power supply ‘on’ - pump will start,

pressurise the system then stop.

b) Open the shower valve or terminal fitting and with shower head in its lowest

position, switch on the power supply to the pump for 5/10 seconds and then

switch off again. Allow a further 30 seconds of gravity flow before switching

the pump on to run for 10 seconds. Repeat this cycling until all air is purged

from the system.

c) Any tap or control valve within the system when opened and closed will now

turn the pump on/off. If this is confirmed to be the case, the system is now

operating

correctly.

d) Carefully check pump and pipework for leaks whilst pump running and

stationary before leaving the installation unattended.

5.14

For Further Technical Support: Phone the Stuart Turner PumpAssist team on

0844 98 000 97. Our staff are trained to help and advise you over the phone.