beautypg.com

Storage, maintenance, transport, and service – American Power Conversion 990-2233A User Manual

Page 12

background image

12

Smart-UPS RT 2400/3000 VA Tower/Rack-Mount UPS User Manual

Storage, Maintenance, Transport, and Service

Storage, Maintenance, Transport, and Service

Storage

Store the UPS covered in a cool, dry location with the battery(s) fully charged. At 5° to 113° F (–15° to 45°

C), charge the UPS battery every six months.

To Install a Replacement Battery

This UPS has an easy-to-replace, hot-swappable battery module. Replacement is a safe procedure, isolated

from electrical hazards. You may leave the UPS and connected equipment on during the replacement

procedure. See your dealer or contact APC at the Web site, www.apc.com for information on replacement

battery modules.
The battery replacement procedure must include replacing all battery modules in the UPS and connected

external battery pack(s).
1. Remove all battery modules in the UPS.

a. Remove the front bezel and screws .
b. Pull down the battery cover and disconnect the top battery .

Once the batteries are disconnected, the connected equipment is not protected from power

outages.

c. Remove the top battery module .
d. Remove the bottom battery module .

2. Recycle old batteries.

Be sure to deliver the spent batteries to a recycling facility or ship to APC in the

replacement battery packing material.

Pb

Pb