En g l is h english, Faucet function – Pfister GT42-YP0Y User Manual
Page 4
E
N
G
L
IS
H
ENGLISH
ENGLISH
12
13
14
15
16
12 BALL ROD PREPARATION
Unscrew Nut (12A) from the Drain Body (12B) and retain one Packing Ring
(12C) inside the Ball Rod Opening (12D). Take off the Spring Clip (12E) from
the Ball Rod (12F).
13 POP-UP BALL ROD INSTALLATION
Drop the Stopper (13A) into Drain Body (13B) with the Off-Set (13C) facing
the rear. Place Nut (13G) and the other Packing Ring (13H) onto Ball Rod
(13D). Insert the Ball Rod (13D) into the Ball Rod Opening (13E) through the
Stopper Hole (13F) and secure with Nut (13G).
14 POP-UP ROD LINKAGE & ADJUSTMENT
Place one end of Spring Clip (14A) onto the end of Ball Rod (14B). Insert the
Ball Rod (14B) through a hole of Strap (14C). Connect the other end of Spring
Clip (14A) to Ball rod (14B). Insert bottom of Lift Rod (14D) into the hole on
top of Strap (14C). Adjust the Lift Rod (14D) height by tightening the Thumb
Screw (14E) on the Strap (14C) or by placing the Ball Rod (14B) on another
hole of Strap (14C). Be sure to leave enough space between Lift Rod Knob
(14F) and Faucet Body (14G) when Lift Rod is down.
15 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below
the sink.
FAUCET FUNCTION
16 VALVE FUNCTION
By lifting the Lever Handle (16A) up, the valve will be activated allowing water
to fl ow. The water fl ow will increase by continuing to lift up the Lever Handle
(16A). By rotating the Lever Handle counter-clockwise, the water temperature
will decrease to cold fl ow only. By rotating the Lever Handle clockwise, the
water temperature will increased to hot fl ow only.
4
14B
14E
16A
12C
12F
12A
12B
12E
12D
13A
13B
13C
13D
13F
13E
13D
13G
14C
14D
14A
14B
14A
14F
14G
13H
14C
16A
OPEN
HOT
COLD