beautypg.com

Installation, Shipping contents, Installation prerequisites – ADTRAN Hub User Manual

Page 11: Shipping contents installation prerequisites

background image

Installation

61181012L1-5C

5

INSTALLATION

After unpacking the 10Base-T Hub, inspect it for damage. If damage has occurred, file a
claim with the carrier then contact ADTRAN Customer Service. Refer to

“Appendix A,

Warranty”

for further information. If possible, keep the original shipping container for

returning the 10Base-T Hub for repair or for verification of shipping damage.

Shipping Contents

The contents include the following items:

• 10Base-T Hub
10Base-T Hub Installation and Maintenance Practice (P/N 61181012L1-5)
• An external mounting bracket that is shipped assembled to the hub and is used for wall

mount and chassis mount

• An internal mounting bracket that is shipped unassembled with the hub and is used to bay

framework-mount the unit

• Rubber desk mounts
• Four 6-32 × 3/16 flathead screws, one cable tie, and five 12-24 × 3/8 screws

Installation Prerequisites

Before installing the 10Base-T Hub, observe the following:

• Never install telephone wiring during a lightning storm.
• Never install telephone jacks in wet locations unless the jack is specifically designated for

wet locations.

• Never touch uninsulated telephone wires or terminals unless the telephone line has been

disconnected at the network interface.

• Use caution when installing or modifying telephone lines.
• When installed, this unit is intended to be used behind devices that provide primary

lightning protection.

The 10Base-T Hub ships pre-assembled to the external mounting bracket, and unassembled
from the internal mounting bracket. It is necessary to disassemble the 10Base-T Hub before
installing on a wall or in a rack. See

Figure 3

and

Figure 4

for details on disassembling and

assembling the 10Base-T Hub.

C A U T I O N !

SUBJECT TO ELECTROSTATIC DAMAGE

OR DECREASE IN RELIABILITY.

HANDLING PRECAUTIONS REQUIRED.