APC UCCS Temperature Control User Manual
Page 42
JANUARY
2008
UCCS
STANDARDS
15950-42
temperature controls contractor. The contractor shall confirm that the communication
network linking controllers within the [Add building name] functions properly, before
connecting the new controllers to the campus network.
3.15 DDC SOFTWARE
A. Provide sufficient internal memory for the specified control sequences and logging. There
shall be a minimum of 15% of available memory free for future use.
END OF SECTION