Operating instructions, Preparing for storage (steps 18 - 22) – MoJack John Deere XD Lift User Manual
Page 18
18
Raising the jack with a power drill (optional –
power drill not included)
The jack can be raised or lowered by using a variable
speed corded drill (7 amp minimum) or variable speed
cordless drill (18V minimum). The drill will require a
3/8” square driver (NOT INCLUDED).
• Remove Crank Handle by taking off the Nylon Lock
Nut and Spring using 17mm wrench.
After Crank Handle removal, re-attach Spring and
Nylon Lock Nut to Crank Handle to prevent loss.
• Set the drill to the highest torque.
• Firmly insert the 3/8” square driver in the Square
Receiver. Rotate the drill forward (clockwise) to
raise the Lift Arm and rotate the drill in
reverse (counterclockwise) to lower the Lift Arm.
• Carrier Locking Handle must be manually pulled out when lowering
until it clears the bottom Tower Hole.
NOTE: Crank Handle must be removed in order to use the drill attachment.
Follow all other operating instructions while using the drill attachment. Replace the Crank Handle as necessary for
future use.
NOTE: When re-assembling the handle, take care not to over-tighten the Nylon Lock Nut against the spring.
There should be enough free space for the handle to be pushed in to move from storage position to operating position.
NOTE: When re-assembling the handle, a “popping” sound may occur due to the re-engagement of the clutch system.
STEP 17
Operator must have a firm grip on the drill before raising or lowering the Lift Arm.
3/8”
Square
Driver
Square
Receiver
STEP 18
Removing the Wheel Pads
• Remove Push Pins and
pull the Lift Arm Inserts
and Wheel Pads out of the
Lift Arm .
• Store the Push Pins in the
Lift Arm and the Wheels Pads
to prevent loss.
Preparing for Storage (Steps 18 - 22)
Push Pin
Push Pin
Lift Arm Insert
Lift Arm
Wheel Pad
Operating Instructions
When raising while
using the drill,
USE BOTH HANDS
AND GRIP FIRMLY!!