Operating instructions, Preparing for use (steps 1 - 8) – MoJack John Deere XD Lift User Manual
Page 12
12
Operating Instructions
Preparing for use (Steps 1 - 8)
STEP 1
Unfolding the Mower Lift
• Pull and rotate Tower Locking Pin 90 degrees to the
unlocked position.
• Raise the Tower by pulling up on the Grip Handle. Once the
Tower is in the vertical position, lift up on the Grip Handle and
drop the Tower into the Base.
• Lock the Tower into place by rotating Tower Locking Pin until
the pull ring retracts into the locking slot.
Tower
Locking Pin
(locked position)
Tower Locking Pin
(unlocked position)
Tower Locking Pin
(locked position)
STEP 2
Hair Pin
Lift Arm
Carrier
Clevis Pin
Installing Lift Arm
• Insert the Lift Arm into the Carrier and insert
the Clevis Pin through the hole in Carrier and
lock by fastening the Hair Pin to the Clevis Pin.