beautypg.com

3 installation and configuration steps, 4 installing the battery packs, Nstallation and – IEI Integration AUPS-C20 v1.01 User Manual

Page 23: Onfiguration, Teps, Nstalling the, Attery, Acks, Figure 3-1: top cover retention screws

background image

AUPS-C20 UPS Module

Page 15

3.3 Installation and Configuration Steps

The following installation steps must be followed.

Step 1:

Unpack the UPS module

Step 2:

Install the battery packs

Step 3:

Mount UPS module to the AFOLUX panel PC

Step 4:

Connect the UPS module to the AFOLUX panel PC

3.4 Installing the Battery Packs

NOTE:

Before installing the battery packs into the AUPS-C20, it is

recommended to press the MCU reset button to return the AUPS-C20

to the factory default settings.

The AUPS-C20 could be installed up to four battery packs. To install the battery packs,

follow the steps below.

Step 1:

Remove the six top cover retention screws (Figure 3-1) and lift the top cover off

the AUPS-C20 module.

Figure 3-1: Top Cover Retention Screws