Oven service procedures – XLT XD-9006A (GAS Oven Version – C, AVI Hood Version – B) User Manual
Page 22

22
Technical Support US: 888-443-2751
Technical Support INTL: 316-943-2751
OVEN SERVICE PROCEDURES
Multi-Valve Adjustment Procedure
Check Incoming Pressure:
Loosen screw 1 full turn counter clockwise (Figure 1)
Hook up Manometer to this test port
Turn main switch to the on position
Document incoming pressure on startup checklist. (If new installation)
Figure 1
Turn Main switch to the off position
Disconnect Manometer
Tighten screw clockwise until snug (Figure 2)
Figure 2