King Electric SR self-reg, cut to length User Manual
Page 14

Rev 11.04.12
www.king-electric.com
14
11
Insert fitting with sealing gasket and thread
until snug. If junction box has clearance hole
then thread locking nut down until snug.
12
Insert cable and tighten fitting.
Use wire nuts and make connections between
supply wires and heating cable wires, in
addition to the ground wires. Not intended for
use with aluminum wire.
13
Apply warning label.
13
IMPORTANT: For the warranty to be
valid, the installer,
customer and user must comply with all the requirements
outlined in these guidelines. All design information
provided in these instructions are based on a
“standard”
shake or shingle and metal roof applications. For any other
application or method of installation, consult a design
specialist.
ELECTRICAL CODES
Article 426 of the National Electrical Code (NEC), and Part
1, Section 62 of the Canadian Electrical Code (CEC),
govern the installation of SRP heating cables for roof and
gutter deicing
and must be followed.